Ian Farmer Associates (Severn Trent client) was tasked with creating boreholes for testing Severn Trent drinking water. The existing sites were at risk of contamination owing to the open access of the water. Ian Farmer Associates designed the head wall over the borehole with a lockable lid to allow access while remaining secure. Milestone Communications formed and built the cast for the head wall. ATV delivered to site and installed demarcation fencing around the perimeter of the borehole. Severn Trent now has safe access, minimising the risk of contamination.

Severn Trent Water – observation borehole
Severn Trent Water – observation borehole